Elnusa Samudra 1

  • LOA 45.30 (148.6’) (M) (ft)
  • Breadth 9.00 (29.52’) (M) (ft)
  • Depth 2.70 (8.85’) (M) (ft)
  • Draft 1 – 2.25
  • GT 413
  • NT 125
  • Last Dry Dock 30 July 2011

On operation since 2005 for Total E&P Indonesia in Delta Mahakam field for supporting well intervention services (such as slickline & Wireline).

Download PDF Here