Elnusa Samudra 2

  • LOA 46.82 (160’) (M) (ft)
  • Breadth 18.29 (60’) (M) (ft)
  • Depth 3.05 (10’) (M) (ft)
  • Draft 2.40(M)
  • GT 814
  • NT 245
  • Last Dry Dock July 2011

On operation since 2006 for Total E&P Indonesia in Delta Mahakam field for supporting well intervention services (such as Snubbing, Slickline & Cementing).

Download pdf here