Elnusa Samudra 7

  • LOA 60.96 (200’) (M) (ft.)
  • Breadth 18.29 (60’) (M) (ft.)
  • Depth 4.0 (M) (ft.)
  • Draft 2.90 (M)(ft.)
  • GT 2074
  • NT 623
  • Last Dry Dock -

On operation since 2011 for Total E & P Indonesia in Delta Mahakam field for supporting well intervention services (such as: Coil Tubing, Cementing, Capillary String, Slick Line & Simultaneous Operations with Testing Barge).

Download PDF Here